Video & Sound Production's Project II



22/04/2019 - 20/05/2019
(Week 04 - Week 08)
Fong Ee Xuan (0332842)
Video & Sound Production
Project II


LECTURE NOTES

FILM PRODUCTION

Mr Martin explain to us the main types of production in any film production.




 INSTRUTIONS




PROJECT II

SHOOTING PRACTICE & EDITING 

PRE-PRODUCTION

Week 04 

(22/04/2019)

For this project, we have to recreate a Thai ad that we have watched. Mr Martin separate us into two group, one is shooting the girl part and another is for the guy part. My group was in charge of the girl part. 

Video 1.0: Boy Part

Video 1.1: Girl Part

After grouping, we start discuss the positions and roles for everyone in the group. Here are the positions for our group member:

Director: Kimberly
Asst. Director: Zoe, Sara
Producer: Aaron
Art Director: Rachel, Ned
Director of Photography: Jennifer
Cameraman: Lee Yu Hui
Light and Sound Crew: Angeline, Nicole and Lungga
Actress: Debbie

After that, we have to think about our group name. It is really hard to time about the group name so is took awhile to think. In sudden, our producer - Aaron saw a ladder that was just there in the classroom where we were in. So we decided to call our group "Ladder in the Room". Aaron create a logo for our group.

Figure 1.0: Our group logo

After we decided our positions, we walked around campus to see which location is suitable for each scene following the storyboard. 

Figure 1.1: StoryBoard #1

Figure 1.2: StoryBoard #2

Figure 1.3: StoryBoard #3

Figure 1.4: StoryBoard #4

Figure 1.5: StoryBoard #5

After we walking around campus, we discussed and listed down which locations were gonna be used for which scenes and also the props and costume that will be used and worn in the video.

Locations
Scene 1: Outside Grand Hall or D3.19 or Block E Corridor or Design Studio
Scene 3: Lakeside
Scene 5: Design Studio
Scene 7: Road to DK or Block A Bus Stop or Uni Square
Scene 7 Shot 2: Block E Level 2
Scene 9: Block E Level 2

Props
Scene 3 : Candle, cake, plate, backpack
Scene 6 : Drawings/ graphics
Scene 7 : Spray bottle for water to imitate sweat
Scene 9 : Backpack

Costume
Scene 1: Gray Dress
Scene 3: White T-shirt
Scene 5: Gray T-shirt
Scene 7: White sport Tee
Scene 9: White T-shirt with Flannel/Blazer

Makeup

Light with neutral colour eyeshadow, soft colour lipstick

FILMING 

Week 05

(29/04/2019)

This week, we started to film our short video. We gathered at around 7 am and production began after everyone arrived at the scene. We all did our assigned jobs at each location.









 Figure 1.6 - Figure 1.13: Shooting

POST- PRODUCTION

Week 07 - Week 08

(13/05/2019 - 20/05/2019)

After we finished shooting, we have to compiled all the footage that we recorded along with the other group's footage, which is the guy part. I started edit all the footage in Adobe Premier along with colour corrections according to the original video. After that, I edited the audio in Adobe Audition. After that, I combined the edited video and edited audio together in Adobe Premier.

Figure 2.0: Footages and Audio for girl part (Chosen)

Figure 2.1: Footages and Audio for guy part (Chosen)

Figure 2.2: Editing the footages in Adobe Premier

Figure 2.3: Editing the audios in Adobe Audition

Figure 2.4: Combining both in Adobe Premier 


Video 2.0: My Final Outcome



Comments

Popular posts from this blog

Design Principles's Exercise & Project

Brand Corporate Identity's Project I

Korean 01's Assessments